Details: labour charges for removing grass, thorney shrubs, jungli shrub, kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. supplying hard murum/ kankar at the road site, including conveying and stacking complete spreading hard murum/ soft murrum/ gravel or kankar for side width complet compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering etc. complete construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader/ paver on prepared surface and compacting with vibratory roller to achieve the desired
Sector: RDPR