Details: subwork no 3:- nadep composed pits - 6 nos. item no.1: excavation for foundation/pipe trenches in hard murum and boulders,w.b.m.road including removing the excavated material upto a distance of 50m beyond the area and lift sasbelow,stacking and spreading as directed byengineer-in-charge,normal dewatreing,preparing the bed for foundation and excluding back filling, etc. complete.(bd-a-3/259)lift 0 to 1.5 m item no.2: providing dry trap/ granite/ quartzite/ gneiss, rubble stone soling in15cm to20cm thick layers(including hand packing and compacting),etc. complete. item no.3:- providing and laying in situ cement concrete m-15 of trap / granite / quartzite / gneiss metal for foundation and bedding including bailing out water , for work , compaction , curing etc complete(cement 5.90 bags/ ) mpcc (m 150) for levelling course item no.4:- providing fly ash brick masonry with conventional/i.s. type bricks in cement mortar 1:6 in super
Sector: RDPR