Details: sub work no .1:- 10 kld public leach pit (no of unit 3 = per unit 32842 =98526)excavation for foundation/pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (bd-a-1/259) -excavation work (0.0-1.5m) excavation for foundation / pipe trenches in hard murum and boulders, w.b.m. road including removing the excavated material upto a distance of 50 m beyond the area and lifts as below, stacking and spreading as directed by engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (bd-a-3/259) - excavation work (0.0-1.5 m) excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 m beyo
Sector: RDPR