Details: sub work no 01- 50 kld stp based on camus technology excavation for foundation / pipe trenches in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (bda1/259)0.00 to 1.50 m 1.50 to 3.00 m 3.00 to 4.50 m excavation for foundation / pipe trenches in hard murum and boulders, w.b.m. road including removing the excavated material upto a distance of 50 m beyond the area and lifts as below, stacking and spreading as directed by engineerincharge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete. (bda3/259)0.00 to 1.50 m 1.50 to 3.00 m 3.00 to 4.50 m excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material upto a distance of 50 m bey