Details: excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97 % of standard proctor density after laying them in layers of 20 cm. to 30 cm. with vibratory roller. supplying hard murum/ kankar at the road site, including conveying and stacking complete spreading hard murum/ soft murrum/ gravel or kankar for side width complet picking the road surface including sectioning etc. complete (bt surface.) providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding materials to fill up the interstices of coarse aggreg
Sector: RDPR