Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mmin thickness. excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff asdirected all sorts of soils. watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 m, not less than 97% of standard proctor density after laying them inlayers of 20 cm. to 30 cm. with power roller. supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation i
Sector: RDPR