Details: supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders/rubble at the roadside breaking them to required gradation including conveying the boulders/rubble and stacking the broken metal etc.complete. a)80mm metal, by breaking rubble obtained by blasting.(hand broken). pwd ssr 22-23 ssr supplying hard murum /kankar at road side including conveying and stacking etc complete. pwd ssr -22- 23. sr no-102 page no 24 (item no .2.29а) supplying.soft murum at the road site, including conveying and stacking complete. (egs dsr 2022-23 1.no. 2.29ь 1 |supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders/rubble at the roadside breaking them to required gradation including conveying the boulders/rubble and stacking the broken metal etc.complete. a)40mm metal, by breaking rubble obtained by blasting.(hand broken). pwd ssr22-23 ssr compacting the subgrade/gravel/sizemetal (200mmloose) layers for all widths with power roller h
Sector: RDPR