Details: sub work no.01 constructing of leach pit (no of unit 5 )excavation for foundation in hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift from 1.5 to 3.0m.) by mechanical means. providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. providing and laying in situ cement concrete of 1:4:8 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum type mixer with scada with fine agreegates of required specifications (natural sand / vsi sand finely washed etc) providing second class burnt brick masonry with conventional/ i.s. type bricks in cement mortar 1:6 in foundat
Sector: RDPR