Details: laying and jointing pvc pipe. heading sub-estimate no i: strengthening & upgradation to roads by concretization excavation for roadway in earth, soilof all sorts, sand, gravel or softmurum including dressing section tothe required grade, camber and sideslopes and conveying the excavatedmaterials with all lifts upto all leads.and spreading for embankment orstacking as directed. milling of existing bituminous surfaceto specified depth of bituminous layerincluding disposal of removedmaterial with all lift and all leads etccomplete. using machine like writgen(w100) or equivalent removing lime or lean cementconcrete including stacking thespoils as directed with all leads,lifts etc, complete providing earth work in embankmentwith approved materials obtainedfrom other sources upto all leads.including all lifts, laying in layers of20cm. to 30cm. thickness breakingclods, dressing to the required lines,curves, grades & section, wateringand compaction with vibratory rollerwith v-sat attachm
Sector: Industry Development