Description: C O ONE CLASS ROOM BUILDING TO Z P PRIMARY SCHOOL AT CHEK ASHTA TA POMBHURNA Name of Work C O ONE CLASS ROOM BUILDING TO Z P PRIMARY SCHOOL AT CHEK ASHTA TA POMBHURNA PART A TS No
Details: Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) Bd.A.1 Page No. 259 Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift 1.5 m.to 3.00m) Bd.A.1 Page No. 259 Providing soling using 80 mm size granite / quartzite / gneiss / trap metal in 15 cm. layer including hand packing filling voids with sand / grit, ramming, watering etc complete. ( Including Royalty
Sector: RDPR