Details: item no.1 : cleaning, cutting ,throny shrubs, bushes ,grass including all lead & lift and depositing as directed , including 1 % cess for labour welfare etc complete . item no. 2 : removing the pitching including necessary excavation if required and stacking them neatly including all lead & lift , including 1 % cess on labour welfare etc. complete . item no.3 : stripping up to 10 cm depth in all kind of soil, soft murum hard murum, with all lead & lift and depositing as directed by engineer in charge including 1 % cess on labour welfare etc.complete item no. 4 : providing hearting embankment using selected impervious soil from approved borrow areas in layers including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods, leveling, sectioning edges / sides, watering, compacting each layer to density control of not less than 95 percent or as stipul
Sector: RDPR