Details: item no.1: excavation for deep trenches for laying rising main in earth soil of all types, sand, gravel and soft murum including trimming to correct line, level and to specified widths including removing the excavated material and stacking or spreading the same upto a distance of 1 km and all lifts as directed, preparing the bed forfoundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessaryspecials etc complete as per detailed specifications as directed. (payable measurements with vertical excavation) item no.2: excavation in hard murum including boulders up to 0.6 m diameter (0.113 ) for canal, seating of embankment, filter drains / catch water drains etc., and placing the excavated stuff neatly in dump area or for formation of service road / embankment including cost of all materials, machinery, labour, dressing bed and sides to required level and profile etc., complete with lead up to 15 m and all lifts as directed. item no.3: exca
Sector: RDPR