Details: item no.1 : cleaning, cutting ,throny shrubs, bushes ,grass including all lead & lift and depositing as directed , including 1 % cess for labour welfare etc complete . item no. 2 : removing dry rubble stone pitching including stacking them neatly including all lead & lift , including 1 % cess for labour welfare etc. complete item no.3 : stripping up to 10 cm depth in all kind of soil, soft murum hard murum, with all lead & lift and depositing as directed by engineer in charge including 1 % cess on labour welfare etc.complete item no.4 : excavation in all kinds of soils & soft murum including boulders up to 0.6 m diameter (0.113cum) for cot / ww bar & flank wall / tail & approach channel and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % cess for labour welfare etc. complete . it
Sector: RDPR