Details: item no.1- excavation for deep trenches for laying rising main in earth soil of all types, sand, gravel and soft murum including trimming to correct line, level and to specified widths including removing the excavated material and stacking or spreading the same upto a distance of 1 km and all lifts as directed, preparing the bed for foundation and necessary safety precautions , keep the trench undisturbed till pipe laying & fixing necessary specials etc complete as per detailed specifications as directed.(payable measurements with vertical excavation) item no.2- excavation for deep trenches for laying rising main in hard murum, soft bhisa, hard murum and boulder including trimming to correct line and level and to specified width, including removing the excavated material and stacking or spreading the surplus stuff including all leads and all lifts as directed by engineer in charge, preparing the bed for foundation and necessary safety precautions , keep the trench ndisturbed till pi
Sector: RDPR