Details: item description removal of earth/ soil of all types/ sand/ gravel/ hardened spillage material by manual means upto depth of minimum100mm from railway track for a length of 180m including dressing section to the required grade, camber and side slopes and including removing the excavated material up to a distance of 200 m. beyond the building area and disposal of surplus excavated earth, debris, dismantled materials etc. to other areas anywhere within the factory upto 3 km beyond the initial lead of 200 m including loading and unloading as directed, dewatering, preparing the bed for the pcc and necessary back filling, ramming, watering etc. complete. note: in case the executed length is less than 180m then pro-rata payment shall be made. supplying and filling in railway track with crush sand of approved quality including compaction and dressing each deposited layer by ramming and watering, etc., complete in all respects as per direction of engineer-in- charge laying low densi
Sector: Industries and Factories