Details: name of sub work -- proper work excavation for foundation / pipe trenches in earth, soil of all types, sand, gravel and soft murum including removing the excavated material upto a distance of 50 m and lift upto 1.5 m, stacking and spreading as directed. dewatering, showring and strutting, preparing the bed for the foundation etc. complete. excavation for foundation / pipe trenches in soft rock and old foundation and lime masonry foundation, asphalt road including removing the excavated material upto a distance of 50 m with lift upto 1.5 m stacking as directed dewatering, showring, structing, preparing the bed for the foundation and excluding back filling etc. complete. providing murum bedding in trenches with approved murum from excavated materials from fiundations / trenches in 15 to 20 cm layers including watering and compaction, etc. complete. providing and supplying in standard lengths pvc / gimd pipes as mentioned below as per relevant is specifications excluding gst levied by goi
Sector: RDPR