Details: item no. 1: excavation for foundation in earth soil of all types sand gravel and soft murum including removing the excavated materials upto a distance of 50 meter beyond the building area and stacking spreading as directed watering preparing the bed for the foundation and necessary back filling ramming watering including shoring and strutting etc. complete. (lift upto 1.5 m) (spec no. bd.a.1, page no.259) (21.1) item no. 2: providing and laying cast in situ/ready mix cement concrete in m-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based plc with scada enabled reversible drum type mixer/concrete batch mix plant (pan mixer) etc. complete. with fine aggregate (crushed sand vsi grade) (24.01) item no. 3: providing uncoursed rubble masonry of trap /
Sector: RDPR