Details: excavation for foundation in earth, soils of all types, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 m. beyond the building area stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering (including shoring and strutting) etc. complete. (lift upto 1.50 metre). spec. no. : bd.a.1 page no. 259. ssr i.no. 21.02 excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.50 m) by mechanical means dsr i.no. 21.06 filling in plinth and floors with approved excavated material in 15cm. to 20cm. layers including watering and compacting etc. complete. dsr i.no. 21.36 filling in plinth and floors with contractors
Sector: RDPR