Details: item no.1:- excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. s s r 2.13 item no.2:- excavation for roadway in hard rock by wedging and chisellingor line drilling including dressing section to the required grade,camber and side slopes and conveying the excavatedmaterials with all lifts upto a lead of 50m. and spreading forembankment or stacking as directed. s s r 2.16 item no.3 :-providing and constructing 50 mm. thick modified macadam (mpm) road surface including all materials, preparing the existing road surface, spreading 40mm. stone layers metal 100% crusher broken metal with conical crusher palnt, heating and spraying the bitumen of specified grade @ 1.75 kg / sqm, spreading 12mm.size chips compacting with static roller having weight 8 to 10
Sector: RDPR