Details: excavation for foundation in earth,soil of all types,sand,gravel and soft murum,including removing the excavated material up to a distance of 50m.beyond the building area and stacking and spreading as directed,dewatering,preparingthe bed for the foundation and necessary back filling,ramming,wateringincludingshoringandstruttingetc.complete.(liftupto 1.5 m.) by mechanical means excavation for foundation in earth, soil of all types, sand, gravel and soft murum,including removing the excavated material up to a distance of 50 m. beyond thebuilding area and stacking and spreading as directed, dewatering, preparing the bedfor the foundation and necessary back filling, ramming, watering providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cmthick including hand packing and compacting etc. complete. providing and laying in situ cement concrete of 1:4:8 proportion with trap/granite/quartzite/gneiss metal in foundation including necessary formwork,compactin
Sector: RDPR