Details: removing of silt, dry leaves, murrum, small boulders, etc. completely from the bed of open nallah, drains, open rubble pitched drains, canals & disposing the removed earth within a lead of 50 mtr during monsoon period. the rates are including removing of green wild creepers etc. silt thickness upto 100 mm thick and upto 3.00 m depth. 230 to 749 mm wide at bottom 750 to 2000 mm wide at bottom above 2000 mm upto 3000mm wide at bottom above 3000 mm upto 5000mm wide at bottom desilting of deposited silt by excavating from the stalling ponds & drains, canals, etc. at various locations and sizes and depth upto 3m below ground level including removing of wild vegetations, creepers, if any by the side of ponds as per the directions of project engineer open rcc canals, drains inside and outside fencing from box culverts arches. lead charges for removal of soil deposited from stalling ponds and other areas of barc by mechanical transport for lead or mentioned below including loading, unloadin
Sector: Research center