Details: construction of sambhamandap indapwadi tq. parli execavation for foundation in earth,soil of all types,sand,gravel and soft murum,including removing the excavated material up to a distance of 50m. beyond the building area and stacking and spreading 1)excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 0.00 to 1.50 m.) by manual means di no.21.01p no.153 excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift up
Sector: RDPR