Details: construction of compound wall at krida sankul mahal in pr. no. 18 dismantling the r.c.c. work 1:2:4 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. dismantling brick masonry in mud and stacking the materials as directed with all leads, lifts etc. complete. excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. by mechanical means (spec. no. : bd.a. 1 page 259/csr i page no. 148) providing soling using 80 mm size trap metal in 15 cm. layer including filling voids with crushed sand/grit, ramming, watering etc. complete. providing and laying cast in situ/ready mix