Description: Geotechnical Investigation for construction of Metro Bhavan and Staff Quarters for Mumbai Metro Rail Corporation Ltd Name of Work Geotechnical Investigation for construction of Metro Bhavan Staff Quarters for Mumbai Metro Rail Corporation Ltd
Details: Providing and transporting necessary and adequate plant and equipment to site within a lead of 50 km for taking trial bores for subsoil investigations including conducting an initial survey for establishing datum RLS and locations at trial bores including installation of the drilling equipment of the first bore location etc. complete as specified and directed Shifting and locating the drilling equipment from one location to another within a lead of 500 m between successive locations including surveying the spot for establishing bore hole location, fixing ground levels with reference to datum RLs and observing groundwater level during boring operation etc. complete as specified and directed. Taking trial bores upto 150 mm dia. for subsoil investigation through overburden and soil of all sorts including providing of temporary casing and cleaning the bottom of holes before conducting field tests or collecting samples at various depths including backfilling of borehole with suitable mater