Details: item no. 1 excavation for foundation/pipe trenches in earth, soils of all ltypes, sand, gravel and soft murum, including removing the excavated material upto a distance of 50 metres and lifts as below, stacking and spreading as directed, normal dewatering preparing the bed for foundation and excluding back filling etc complete (bd-a-1/259) lift 0 to 1.5 m mjp/dsr/2023-2024/ page no.37 i.no. 1 item no. 2 excavation for foundation/pipe trenches in hard murum and boulders, w.b.mn. road including removing the excavated material upto a distance of 50 m beyond the area and lifts as below, stacking and spreading as directed by engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete ( bd-a-3/259) lift 0 to 1.5 m mjp/dsr/2023-202
Sector: Municipality