Details: part i :- solid wastesuwork no. 1 :- community constructed compost pititem no.1 :- excavation for foundation trenches in earth,solis of all types, sand, gravel and softmurum, including removing the excavated material upto a distance of 50 mtrs and lifts as below,stacking and spreading as directed,manual dewatering, preparing the bed for foundation and excluding backfilling, etc complete item no. 2 :-excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5m.) by mechanical means item no. 3 :-providing and laying cast in situ / ready mix cement concrete in m-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, steel centering, formwork, laying/ pumping,