Details: item no.1: excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting as necessary and disposing off excavated stuff as directed etc. complete. by manual means [a] upto 1.50mtr. lift, normal rate item no.2:providing and laying in situ cement concrete of m10 proportion with trap/ granite/ quartzite/ gneiss metal in foundation including necessary form work, compacting and curing etc. complete. (with reversible drum rtype mixer with scada with natural sand) item no.3: providing cast in situ / ready mix m20 grade cement concrete for head walls of cd work / retaining walls etc. including necessary form work, compaction, finishing and curing etc. complete. (with reversible drum type mixer/ concrete batch mix plant (pan mixer) with scada item no.4: providing and laying cast in situ/ready mix cement concrete in m20 of trap/ granite/quartzite/gneiss metal for bed blocks, foundation blocks and such other items including bailing out water,
Sector: RDPR