Details: excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. ( by mechanical means )a) upto 1.50m lift normal rateb) 1.50m to 3.00m lift, add 10%c) 3.00m to 4.50m lift, add 20%d) 4.50m to 6.0m lift, add 30% excavation for foundation in hard murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.a) upto 1.50m lift normal rateb) 1.50m to 3.00m lift, add 10%c) 3.00m to 4.50m lift, add 20%d) 4.50m to 6.0m lift, add 30% excavation for foundation in soft rock including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete.a) upto 1.50m lift normal rateb) 1.50m to 3.00m lift, add 10%c) 3.00m to 4.50m lift, add 20%d) 4.50m to 6.0m lift, add 30% excavation for foundation in hard murum including shoring and strutting, dewatering as nece
Sector: RDPR