Details: terracing work section 2/1/a excavation in soil soft murum including stacking the material as directed with load upto 15 mtrs and lift upto 6 mtrs including dressing 1(a) excavation in soil soft murum including stacking the material as directed with lead upto 10 mtrs and lift upto 1.5 mtrs including dressing 8(a) lead charges depositing the excavated material for additional 10 mtrs to 100 mtrs 9(a) earth work dressing grass outlets item no provision for work insurance at 1% item no provision for labor welfare at 1% item no provision for gst charges at 12%
Sector: Agriculture Dept