Details: earth work section -2/item-1-excavation in soil, soft murum, lime,shadu including boulder up to 0.6 m dia and placing excavated stuff neatly in dump area or embankment as directed including cost of all material ,machinery,labour ,dressing bed and side to required level witth lead upto 15 m. & lift up to 1.5 m. including dressing (csr-1) section -2/item-2-excavation in soil, hard murum soft murum, lime,shadu including boulder up to 0.6 m dia and placing excavated stuff neatly in dump area or embankment as directed including cost of all material ,machinery,labour ,dressing bed and side to required level witth lead upto 15 m. & lift up to 1.5 m. including dressing (csr-1) section -2/item-3-excavation in soft rock witout blasting lime,shadu including boulder up to 0.6 m dia and placing excavated stuff neatly in dump area or embankment as directed including cost of all material ,machinery,labour ,dressing bed and side to required level witth lead upto 15 m. & lift up to 1.5 m. including
Sector: Agriculture Dept