Details: item no.1 : - cleaning,cutting thorny shurbs bushes grass as directed with 15 m lead and lift up to 1.50 m item no.2 : - cutting down trees including cutting trunks &branches and stacking the material with 15m leasdand all lift including uprooting and refilling the pit with material etc. complete as directed. item no.3 :dismantling dry rubble stone pitching including stacking all materials with 15 m lead and all lifts etc complete as directed item no 4 :- exvavation in soil / silt /s.m. /shadu /exceeing 1.5 m. in width,including dispossing of the excavated material up to lead of 15 m.& lift up to 1.5 m. stacking as directed including dressing etc. complete. item no.5 : - excavation in hard murum with boulders including stacking the material as directed with lead upto 15m & lift up to 1.5 m including dressing etc.complete item no.6 : - excavation in soft rock without blasting including boulders up to 0.6 m diameter ( 0.113 ) for canal, seating of embankment, filter drain /
Sector: RDPR