Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. excavation for foundation in earth, soils of all types, sand, gravel, soft murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. ( by /manaual means )a) upto 1.50m lift normal rate b) 1.50m to 3.00m lift, add 10%c) 3.00m to 4.50m lift, add 20% d) 4.50m to 6.0m lift, add 30% excavation for foundation in hard murum including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. a) upto 1.50m lift normal rate b) 1.50m to 3.00m lift, add 10%c) 3.00m to 4.50m lift, add 20%
Sector: RDPR