Details: item no.1 : excavation in all kinds of soils & soft murum including boulders up to 0.6 m diameter (0.113cum) for foundation and placing the excavated stuff neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % cess for labour welfare etc. complete . item no.2 : excavation in hard murum including boulders up to 0.6 m diameter (0.113 ) for foundation and placing the excavated material neatly in dump area or for formation of service road / embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with all lead and lift. including 1 % cess for labour welfare etc. complete . item no. 3 : excavation in soft rock without blasting including boulders up to 0.6 m diameter (0.113 ) for foundation , and placing the excavated soft rock neatly in dump area or for
Sector: RDPR