Details: providing and laying in situ cement concrete m -20 with tremix treatment for 200 mm thickness forconcrete road is including laying plastic sheet for 125 micron thickness with groove cutting of 4 mm wide and 20mm deep with necessary refilling with bitumen ( excluding reinforcement) with coarse and fine aggregate ( naturalsand /vsi grade finely washed crushed sand) etc. complete -- m30 item converted to m20 item. difference in costof cement 0.40 mt - 0.35 mt = 0.05 mt at rs 6000 is 0.05 x 6000 = rs 300, hence final rate = basic rate for m30item - rs 3000 - rs 126 for non scada i.e. (8446 - 300 - 126 = 8020 final rate = 8020.00 supplying hard murum/ kankar at the road site, including conveying and stacking complete spreading hard murum/ soft murrum/ gravel or kankar for side width complet providing and fixing board displaying information, such as 'name of work, tender cost,name of contractor, work completion and liability period etc', having rectangular shapeof 1.20m x 0.90m size made out
Sector: RDPR