Details: section 1 - demolition work note- 01) unless specified, no extra payment shall be made for removing, plaster, tiles, all kinds of floor finish etc. attached to brickwork & rcc work & rcc grade slab in floor. 02) all serviceable & unserviceable materials are separated & stacked separately. 03)dismantled bricks / rubbles shall be stacked properly within a lead of 200m. 04) all works are inclusive of scaffolding at any height of any floor. breaking, demolishing & removing existing brick work , ucr work, rcc work, pcc work such as staircase, column, beam ,slab lintel beam, chajja, part of footings along with cutting of reinforcement, plaster, sanitary & plumbing fittings ,door frame with shutter, window , aluminum window, louvered window ,flooring etc. including scaffolding, supporting existing structure with props and removing the debris & stacking the all type of materials including useable /salable or scrap material at the factory scrap yard within factory premises or within a lead of
Sector: Religious building