Details: item no.1 :-excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a giatance of 50 m beyond the building area and stacking and spreading as directed dewatering preparing the bed for the foundation and necessary back king ramming, watering includ ncluding shoring and strutting etc complete (lift upta 15 m) by mechanical means (ino21-02, pgno 153) (state ssr item spec: (bd a 1 page no. 259) 207.00-5% sugarcane area le 207.00-10.35 item no.2 :- excavation for foundation in hard murum including removing the excavated material upto distance of f and stacking and spreading as directed 50 metres beyond the building ares dewatenng preparing the bed for the foundation and necessary back filing, ramming, watening induding shoring and strutting etc complete (liff upto 1.50 m) by mechanical mean (ino21-06. pgno 153) (state ssr) item spec: (bd.a2p 259) 227.005% sugarcane area ie 227.00-11.35 item no.3 :- providing and lay
Sector: RDPR