Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. picking the road surface including sectioning etc. complete (bt surface.) supplying hard murum/ kankar at the road site, including conveying and stacking complete spreading hard murum/ soft murrum/ gravel or kankar for side width complet compacting the hard murum side widths including laying in layers on each side with vibratory rolle
Sector: RDPR