Details: supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (prior approval of sample stack of broken metal by the executive engineer is necessary the date of approval will form part of the measurements) - 60 milimetre metal, by breaking rubble obtained by blasting. (hand broken).item / page no : 54a / 345additional specifications : 1. work shall be carried out as per the instructions of engineer in-charge. 2. prior approval of sample stack of broken metal by the executive engineer is necessary. the date of approval will form part of the measurements. supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete.item / page no : 29a / 25specification no : morth-408spec. page no : 139-142 spreading 60 mm metal for road work including sectionong, excetra complete as directed by engineer in charge.
Sector: RDPR