Details: description :supply, installation and commissioning of lifting tackle assembly of 25-ton capacity for icf coaches and lhb coaches as per railway drg. no. s-1978 and s-1979 and scope of work as annexure a. oneset consists of 2 nos. spreader beam each according to above drawing nos. s-1978 & s-1979 and 4 nos. lifting arm. complete lifting tackle assembly shall be load tested as per latest standards and guidelines and ust thereafter. certificates of load testing and ust issued by competent agency shall be submitted with consignment along with material test certificate of complete assembly parts. [ warranty period: 12 months after the date of delivery ]
Sector: Railways