Details: clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.ssr of 2022-23 item no. 2.09 & page no.23 morth 201. excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. ssr of 2022-23 item no. 2.18 and page no. 24. morth 309. providing and constructing 75 mm. thick modified macadam (mpm) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone metal layers 30% crusher broken metal + 70% hand broken (by breaking rubble obtained by blasting) heating and spraying
Sector: RDPR