Details: item no. 1 : clearing grass and removal of up to a distance of 50 metres outside the periphery of the area .spec. no- morth 201 item no. 2excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means item no. 3-construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at omc, carriage of mixed material to work site, spreading in uniform layers with motor grader / paver on prepared surface and compacting with vibratory roller to achieve thedesired density, complete as per clause 401-- mix in place method and grading - i material morth 401 item no.providing soling using 80 mm size granite / quartzite / gneiss /
Sector: RDPR