Details: labour charges for removing grass, thorney shrubs, jungli shrub, kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5 m.) by mechanical means providing selected hard murum filling including laying in layers of 15 to 20cmwith watering and compacting etc. complete. providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. stamp concrete of 100mm thickness - providing and laying in-situ m30 grade unreinforced plain cement stamp concrete of
Sector: PWD