Details: dressing of side shoulder / scrapping the road side shoulder by mechanical means (by jcb / douzer) including excavation of raised side shoulders upto 15 centimetre depth including remooving / cutting bushes, grass and dressing shoulder to desired camber and disposing of excavated stuff up to road boundary, excetra complete as directed by engineer in-charge.item / page no : 23 / 77additional specifications : the work shall be carried out as per the instructions of engineer in-charge. excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 metre beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting excetra complete. - (lift upto 1.5 metre) by mechanical meansitem / page no : 2 / 153specification no : bd.a.1spec. page no : 259 providing dry trap/ granite/ quartz
Sector: RDPR