Details: excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (lift upto 1.5m.) by mechanical means providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. providing and laying cast in situ/ready mix cement concrete in m-10 of trap/ granite/ quartzite/ gneiss metal for foundation and bedding including bailing out water, steel centering, formwork, laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic microprocessor based plc with scada enabled reversible drum type mixer/concrete batch mix plant (pan mixe
Sector: RDPR