Details: sub work -1clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned ,up to lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause 201 (nh 61 to sawargaon) ch -0/00 to 1/600 excavation for roadwork in soil with hydraulic excavator of 0.9 bucket capacity including cutting and loading in tippers,trimming bottom and side slopes,in accordance with requirement of line,grades and cross sections,and transporitng to the embackment location with a lift upto 1.5m and lead upto 1000 m as per technical specification clause 301.5 (nh 61 to sawargaon) ch -0/00 to 1/600 construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation
Sector: RDPR