Details: excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. dsr i.no. 2.18 supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders /rubble and stacking the broken metal etc. complete . (prior approval of sample stack of broken metal by the ex. engineer is necessary the date of approval will form part of the measurements) a) 80 mm metal, by breaking rubble obtained by blasting.(hand broken).dsr i.no. 50.54 supplying hard murum/ kankar at the road site, including conveying and stacking complete. dsr i.no. 2.29a supplying trap/granite/quartzite/gneiss stone metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders
Sector: RDPR