Details: bituminous macadam: proving and laying bituminous macadam using crushed aggregates of grading 1, premixed with bituminous binder, transported to site with vts, laid over a previously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 80/100 mm compacted thickness with 3.3% using specified grade of bitumen. -using batch mix type hot mix plant with scada, sensor paver, vibratory roller. bituminous concrete (patch work) :- providing and laying bituminous concrete using crushed aggregates of grading 1, premixed with bituminous binder @5.20 percent by weight of total mix and filler, transported to site with vts, laid over apreviously prepared surface, finished to the required grade, level, alignment, and rolling to achieve the desired compaction for 50mm compacted thickness with specified grade of bitumen, excluding prime/ tackcoat. for bitumen of specified grade - using batch mix type hot mix plant with scada, sensor paver,
Sector: Road development