Details: item no.1 removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. item no.2 - excavation for foundation in earth soils of all sorts sand gravel or soft murum including removing the excavated materials upto a distance of 50 m. beyond the buildingg area and lifts upto 1.50 metres, stacking and spreading as directed including dewatering unless provided elwhere, preparing the bed for the foundation and necessary backfilling, ramming, watering complete excluding shoring and structting. item no.3 - excavation for foundation in hard rock by chiselling and wedging or line drilling including shoring and strutting, dewatering as necessary and disposing off excavated stuff as directed etc. complete. item no.4 providing dry/ trap/ granite/ quartzite/ gneiss rubble stone soling 15 cm to 20 cm thick including hand packing and compacting etc. complete. item no.5 providing and laying cast in situ/ready mix cement c
Sector: RDPR