Details: clearing grass and removal of up to a distance of 50 metres outside the periphery of the area. excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. providing earth work in embankment with approved materials obtained from departmental land upto lead of 50 metre including all lifts, laying in layers of 20 centimetre to 30 centimetre thickness breaking clods, dressing to the required lines, curves, grades and section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etcetera complete (material obtained from departmental land) watering and compacting of embankment formed of materials obtained from the road cutting within a lead of 50 metre, not less than 97 % of standard proctor density after laying them in layers of 20 centimetre to 30 centimetre with vibratory rolle
Sector: PWD