Details: labour charges for removing grass, thorney shrubs, jungli shrub, kubabul and alike grass along roadside making the ground clean by showel and phavaras etc. complete. dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately etc. complete. excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 meter and spreading for embankment or stacking as directed. construction of granular sub-base by providing close graded material, mixing in a mechanical mix plant at optimum moisture content, carriage of mixed material to work site, spreading in uniform layers with motor grader/ paver on prepared surface and compacting with vibratory roller to achieve the desired density, complete as per clause 401 -- plant mix method a
Sector: PWD